Leads/3c8222f5
Approved · unknown

Ready Mix Concrete Plant — PALMETTO RM & BLOCK FACILITY

600 9th St W, PALMETTO, FL, 34221

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

Ready Mix Concrete Plant — PALMETTO RM & BLOCK FACILITY

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Operating ready mix concrete plant — supplier/customer location for haulers. | unknown type, no size signal — capped <40

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_ARMS_FACILITIES
    Captured FDEP_ARMS_0810006 from fdep_arms_facilities

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (landfill)
63RD AVENUE EAST WASTE PROCESSING FACILITY · Bradenton
One-way
6.4 mi
Round trip
12.8 mi
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
15.0 mi
Round trip
29.9 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin15.0 mi29.9
quarryWingate Creek MineLithia27.5 mi55
quarryTampa Cement Grinding PlantTampa29.7 mi59.5
quarrySouth Pasture MineLithia39.2 mi78.4
quarryFour CornersLithia40.4 mi80.9
quarryFlorida Shell & Fill Company LLCNaples42.1 mi84.2
quarry4M-31 MineAlva48.6 mi97.2
landfill63RD AVENUE EAST WASTE PROCESSING FACILITYBradenton6.4 mi12.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_arms_facilitiesFDEP_ARMS_08100062026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/3c8222f5