Leads/3a4f666b
Approved · application_filed

ONE WATER PIPELINE SEGMENT C

12104 672 HWY, RIVERVIEW, FL, 33579

Load estimate pending
Lifecycle
Filed as of Feb 9, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

ONE WATER PIPELINE SEGMENT C

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 2/9/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
HILLSBOROUGH COUNTY WATER RESOURCES DEPARTMENT
Why this is a hauling opportunity: Base unknown/other (20) | government/public-authority project (floor 55) | unknown type, no size signal — capped <40

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0461344-004 from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
10.3 mi
Round trip
20.6 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin10.3 mi20.6
quarryTampa Cement Grinding PlantTampa14.7 mi29.4
quarryFour CornersLithia19.5 mi39.1
quarryWingate Creek MineLithia21.4 mi42.7
quarrySouth Pasture MineLithia22.7 mi45.3
quarryCentral State Aggregates LLCZephyrhill29.9 mi59.8
quarrySouth Fort Meade MineLithia33.8 mi67.6
quarryGeorgia Stone Spring Hill QuarryAtlanta 44.2 mi88.4
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
HILLSBOROUGH COUNTY WATER RESOURCES DEPARTMENT

Permits & Sources

Every connector that's seen this project

EARLY SIGNALEnvironmental Resource Permit(FDEP ERP (Water - Individual With No Conceptual Approval Permit))

Pre-construction environmental clearance for site work. Issued = project cleared to grade; contractor typically not yet selected.

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0461344-0042026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/3a4f666b