Approved · unknownPinellas County
3821 9TH AVE S
3821 9TH AVE S
Load estimate pending
Lifecycle
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
3821 9TH AVE S
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
0.1299 ac
Parcel 147149
Est truck loads
—
Needs site plan parse
Sources seen
5
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
BIG TUCKER HOLDINGS LLC
Why this is a hauling opportunity: Building permit | Connector base: 50
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21STPETE_CLICK2GOVCaptured 24-08001971 from stpete_click2gov
- 2026-05-21PCPAOCaptured PCPAO_159949_aab227c3 from pcpao
- 2026-05-22PCPAOCaptured PCPAO_157880_aab227c3 from pcpao
- 2026-05-25PCPAOCaptured PCPAO_154792_aab227c3 from pcpao
- 2026-05-27PCPAOCaptured PCPAO_147149_aab227c3 from pcpao
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
15.6 mi
Round trip
31.1 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Caloosa Materials | Ruskin | 15.6 mi | 31.1 |
| quarry | Tampa Cement Grinding Plant | Tampa | 19.1 mi | 38.3 |
| quarry | Central State Aggregates LLC | Zephyrhill | 38.7 mi | 77.5 |
| quarry | Wingate Creek Mine | Lithia | 38.9 mi | 77.8 |
| quarry | Four Corners | Lithia | 43.7 mi | 87.4 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 44.8 mi | 89.5 |
| quarry | South Pasture Mine | Lithia | 45.9 mi | 91.7 |
| sand pit | County Line Mine | Spring Hill | 46.9 mi | 93.7 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Developer
BIG TUCKER HOLDINGS LLC
Applicant
DAYANAY CASTILLO
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| stpete_click2gov | 24-08001971 | 2026-05-21 | Open ↗ |
| pcpao | PCPAO_159949_aab227c3 | 2026-05-21 | Open ↗ |
| pcpao | PCPAO_157880_aab227c3 | 2026-05-22 | Open ↗ |
| pcpao | PCPAO_154792_aab227c3 | 2026-05-25 | Open ↗ |
| pcpao | PCPAO_147149_aab227c3 | 2026-05-27 | Open ↗ |
Parcel Detail
Pinellas County Property Appraiser
PropertyPCPAO ↗
- Folio
- 159949
- Strap
- 27-31-16-76806-000-0210
- Address
- 3821 9th Ave S
- Zip
- 33711
- Acreage
- 0.1299 ac
- Sq ft
- 5,658
- Year built
- 1972
- Use
- 0110 Single Family ...
- Subdivision
- ROSEMONT
Owner of record
BIG TUCKER HOLDINGS LLC
Last sale
2015-02-01
$32,500
Appraiser valuation
- Just (market)
- $160,413
- Assessed
- $95,724
- Taxable
- $95,724
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/3821-9th-ave-s-pinellas-fl-69c5fec3