Approved · unknownHILLSBOROUGH County
Cleanup (petroleum cleanup) — KEN ROBINSON OF FL INC
3225 E 4TH AVE, TAMPA, FL, 33605
~32loads
fill dirt + base rock
≤1 wk
Lifecycle
Active as of Jun 11, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — KEN ROBINSON OF FL INC
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
0.129 ac
Parcel 1760080000
Est truck loads
—
Needs site plan parse
Sources seen
6
Public records referencing this job
General Contractor
Not yet identified
Why this is a hauling opportunity: FDEP petroleum cleanup site — active remediation. Active cleanups typically require contaminated-soil hauling to disposal.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-06-11FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87942853 from fdep_cleanup_sites
- 2026-06-12HCPACaptured HCPA_1760080000_36e96a2a from hcpa
- 2026-06-15FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87983718 from fdep_cleanup_sites
- 2026-06-19HCPACaptured HCPA_1760080000_dc1c9ce5 from hcpa
- 2026-06-25FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88085763 from fdep_cleanup_sites
- 2026-06-26HCPACaptured HCPA_1760080000_0c0ae20a from hcpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
1.9 mi
Round trip
3.8 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 1.9 mi | 3.8 |
| quarry | Caloosa Materials | Ruskin | 17.6 mi | 35.2 |
| quarry | Central State Aggregates LLC | Zephyrhill | 18.7 mi | 37.4 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 29.9 mi | 59.7 |
| quarry | Four Corners | Lithia | 30.7 mi | 61.4 |
| sand pit | County Line Mine | Spring Hill | 34.0 mi | 68 |
| quarry | South Pasture Mine | Lithia | 36.2 mi | 72.3 |
| quarry | Wingate Creek Mine | Lithia | 36.6 mi | 73.2 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Official source-of-truth portal
Hillsborough County Permits ↗Tampa area permits, inspections, reviews
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_87942853 | 2026-06-11 | Open ↗ |
| hcpa | HCPA_1760080000_36e96a2a | 2026-06-12 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87983718 | 2026-06-15 | Open ↗ |
| hcpa | HCPA_1760080000_dc1c9ce5 | 2026-06-19 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_88085763 | 2026-06-25 | Open ↗ |
| hcpa | HCPA_1760080000_0c0ae20a | 2026-06-26 | Open ↗ |
Parcel Detail
Hillsborough Property Appraiser
PropertyHCPA ↗
- Folio
- 1760080000
- Strap
- A-17-29-19-4OO-000018-00001.1
- Address
- 3225 E 4TH AVE, TAMPA
- Zip
- 33605
- Acreage
- 0.129 ac
- Sq ft
- 5,640
- Homestead
- NO
Owner of record
ELECTRIC PROPERTIES LLC
Last sale
2012-08-31
$100(transfer)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/36e96a2a