Approved · unknownMARION County
Cleanup (petroleum cleanup) — AMOCO-COLLEGE #344
3821 SW COLLEGE RD, OCALA, FL, 34474
Load estimate pending
Lifecycle
Active as of May 28, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — AMOCO-COLLEGE #344
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Parcel 2388-001-000
Est truck loads
—
Needs site plan parse
Sources seen
10
Public records referencing this job
General Contractor
Not yet identified
Why this is a hauling opportunity: FDEP petroleum cleanup site — active remediation. Active cleanups typically require contaminated-soil hauling to disposal.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87797465 from fdep_cleanup_sites
- 2026-06-01MARIONPACaptured MARIONPA_2388-001-000_35d0e080 from marionpa
- 2026-06-13FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87950792 from fdep_cleanup_sites
- 2026-06-13MARIONPACaptured MARIONPA_2388-001-000_bc3208f2 from marionpa
- 2026-06-16FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87981442 from fdep_cleanup_sites
- 2026-06-19MARIONPACaptured MARIONPA_2388-001-000_c775fe2c from marionpa
- 2026-06-23FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88052890 from fdep_cleanup_sites
- 2026-06-24MARIONPACaptured MARIONPA_2388-001-000_ffd8385c from marionpa
- 2026-06-28FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88103887 from fdep_cleanup_sites
- 2026-06-28MARIONPACaptured MARIONPA_2388-001-000_4d0c7070 from marionpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
NORTH MINE · OCALA
One-way
5.7 mi
Round trip
11.5 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | NORTH MINE | OCALA | 5.7 mi | 11.5 |
| quarry | Stavola NW Pit | Ocala | 8.3 mi | 16.6 |
| quarry | 328 Pit | Ocala | 11.1 mi | 22.2 |
| quarry | Lowell Mine & Mill | Ocala | 11.8 mi | 23.6 |
| quarry | Reddick Mine | Pompano Beach | 15.0 mi | 30 |
| quarry | Ocala Quarry | Atlanta | 15.9 mi | 31.8 |
| sand pit | Lynne Mine | Davenport | 17.8 mi | 35.6 |
| quarry | Manko Co Sec 5 Mine/Phos | Ocala | 19.2 mi | 38.4 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_87797465 | 2026-05-28 | Open ↗ |
| marionpa | MARIONPA_2388-001-000_35d0e080 | 2026-06-01 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87950792 | 2026-06-13 | Open ↗ |
| marionpa | MARIONPA_2388-001-000_bc3208f2 | 2026-06-13 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87981442 | 2026-06-16 | Open ↗ |
| marionpa | MARIONPA_2388-001-000_c775fe2c | 2026-06-19 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_88052890 | 2026-06-23 | Open ↗ |
| marionpa | MARIONPA_2388-001-000_ffd8385c | 2026-06-24 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_88103887 | 2026-06-28 | Open ↗ |
| marionpa | MARIONPA_2388-001-000_4d0c7070 | 2026-06-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- Parcel ID
- 2388-001-000
- County
- MARION
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/35d0e080