Leads/34a6a2e7
Approved · unknown

Limestone Quarry — BG GROUP-PORTABLE CRUSHER

ROYAL PALM BEACH, FL, 33411

Load estimate pending
Lifecycle
Completed as of Dec 31, 2009
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

Limestone Quarry — BG GROUP-PORTABLE CRUSHER

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base unknown/other (20)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_ARMS_FACILITIES
    Captured FDEP_ARMS_7775605 from fdep_arms_facilities

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Palm Beach Aggregates LLC · Jacksonville
One-way
8.4 mi
Round trip
16.8 mi
TypeNameCityOne-wayRT mi
quarryPalm Beach Aggregates LLCJacksonville8.4 mi16.8
sand pitMC320 MinePalm City23.3 mi46.6
sand pitPalm City MineGreenacres24.1 mi48.2
quarryFive Stones Mine, LLC.Tinton Falls27.7 mi55.5
quarry1412 Canal PointHammond29.4 mi58.8
quarryStar QuarriesSOUTH BAY31.1 mi62.2
quarryFort Pierce MineJacksonville40.7 mi81.4
quarryRidgdill & SonCLEWISTON43.3 mi86.6
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_arms_facilitiesFDEP_ARMS_77756052026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/34a6a2e7