Leads/338b8544
Approved · unknownLeon County

FDOT — SR 366 PENSACOLA ST FROM RAILROAD OVERPASS TO SR 366 STADIUM DR - RESURFACING

Leon County — FDOT Contract T3916

Load estimate pending
Lifecycle
Active as of Apr 8, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

FDOT — SR 366 PENSACOLA ST FROM RAILROAD OVERPASS TO SR 366 STADIUM DR - RESURFACING

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$44K
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT roadway contract — SR 366 PENSACOLA ST FROM RAILROAD OVERPASS TO SR 366 STADIUM DR - RESURFACING. Vendor: C.W. ROBERTS CONTRACTING, INC.. Cost: $43,700. | FDOT public project (+15) | stage=under_construction, recent (+10) | FDOT public project (+15) | stage=under_construction, recent (+10) | FDOT public project (+15) | stage=under_construction, recent (+10) | FDOT public project (+15) | stage=under_construction, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_T3916_2 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (transfer station)
LEON COUNTY SOLID WASTE TRANSFER STATION · Tallahassee
One-way
1.5 mi
Round trip
2.9 mi
Closest import source (sand pit)
Silver Lake 1 · Tallahassee
One-way
5.1 mi
Round trip
10.1 mi
TypeNameCityOne-wayRT mi
sand pitSilver Lake 1Tallahassee5.1 mi10.1
quarryActive Minerals Attapulgite DivisionQuincy17.6 mi35.2
quarryQuincy Plant and MinesQUINCY17.8 mi35.6
sand pitA-Mining Group II LLC.Quincy18.8 mi37.6
quarryCYD Cabbage GroveDaytona Beach30.0 mi59.9
quarryPerry QuarryFort Myers30.2 mi60.4
transfer stationLEON COUNTY SOLID WASTE TRANSFER STATIONTallahassee1.5 mi2.9
landfillWELDONS LANDFILLTallahassee2.4 mi4.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Leon County Permits
Tallahassee area Building Services
ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_T3916_22026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Leon
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/338b8544