Approved · unknown
Asphalt Plant — BETTER ROADS OF LAKE PLACID DBA BPM CONT
SR 17, DE SOTO COUNTY, FL
Load estimate pending
Lifecycle
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
Asphalt Plant — BETTER ROADS OF LAKE PLACID DBA BPM CONT
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: Asphalt Plant INACTIVE (shutdown unknown). | individual owner, residential scale — capped low | individual owner, residential scale — capped low | individual owner, residential scale — capped low
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_ARMS_FACILITIESCaptured FDEP_ARMS_0270009 from fdep_arms_facilities
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
4M-31 Mine · Alva
One-way
2.9 mi
Round trip
5.8 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | 4M-31 Mine | Alva | 2.9 mi | 5.8 |
| sand pit | Watermelon Pit | Punta Gorda | 13.0 mi | 26 |
| quarry | Farabee Mine & Shell LLC | Punta Gorda | 14.3 mi | 28.6 |
| sand pit | Washington Loop Mine | Punta Gorda | 14.6 mi | 29.2 |
| sand pit | Willliams Farms Sand & Shell, Inc. | PUNTA GORDA | 14.7 mi | 29.4 |
| quarry | Wright Farms Pit | Nocatee | 15.0 mi | 30.1 |
| quarry | Highlands County Shell Pit | Sebring | 15.3 mi | 30.6 |
| quarry | Bermont Materials Alico | Punta Gorda | 15.8 mi | 31.5 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_arms_facilities | FDEP_ARMS_0270009 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/3310c680