Approved · unknownCollier County
FDOT — SR 90 (US 41) FROM N OF THOMASSON DR TO S OF SOUTHWEST BLVD - PAVEMENT ONLY RESURFACE (FLEX)
Collier County — FDOT Contract E1W92
Load estimate pending
Lifecycle
Completed as of May 27, 2025
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
FDOT — SR 90 (US 41) FROM N OF THOMASSON DR TO S OF SOUTHWEST BLVD - PAVEMENT ONLY RESURFACE (FLEX)
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$6.4M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — SR 90 (US 41) FROM N OF THOMASSON DR TO S OF SOUTHWEST BLVD - PAVEMENT ONLY RESU. Vendor: PREFERRED MATERIALS INC.. Cost: $6,394,150. | FDOT public project (+15) | size signal: $6,394,150 valuation (+20) | FDOT public project (+15) | size signal: $6,394,150 valuation (+20) | FDOT public project (+15) | size signal: $6,394,150 valuation (+20)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_E1W92_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Golden Gate Quarry · Daytona Beach, FL
One-way
11.4 mi
Round trip
22.8 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Golden Gate Quarry | Daytona Beach, FL | 11.4 mi | 22.8 |
| sand pit | 846 Mine LLC | Naples | 16.2 mi | 32.3 |
| sand pit | Corkscrew | Estero | 26.9 mi | 53.8 |
| quarry | Fort Myers Quarry | Fort Myers | 27.3 mi | 54.7 |
| quarry | Fort Myers Mine | Jacksonville | 28.4 mi | 56.8 |
| quarry | ALICO ROAD QUARRY | Miami | 28.7 mi | 57.3 |
| quarry | Sunniland Mine | Naples | 29.9 mi | 59.7 |
| quarry | Bell Mine | Fort Myers | 31.9 mi | 63.8 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_E1W92_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Collier
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/318f5ec4