Leads/30d025dd
Approved · application_filed

BROOKER CREEK AT EAST LAKE RD.

NO PHYSICAL ADDRESS - THE PROJECT IS LOCATED WEST OF EAST LAKE ROAD/CO 611 AT, PALM HARBOR, FL, 34685

Load estimate pending
Lifecycle
Filed as of May 12, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

BROOKER CREEK AT EAST LAKE RD.

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 5/12/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
DUKE ENERGY FLORIDA INC
Why this is a hauling opportunity: Base unknown/other (20)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0471695-001 from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
18.8 mi
Round trip
37.6 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa18.8 mi37.6
quarryGeorgia Stone Spring Hill QuarryAtlanta 24.8 mi49.5
sand pitCounty Line MineSpring Hill25.6 mi51.2
quarryCentral State Aggregates LLCZephyrhill26.2 mi52.4
quarryCaloosa MaterialsRuskin30.6 mi61.3
quarryBrooksville QuarryBrooksville38.1 mi76.2
quarryBrooksville South Cement PlantBrooksville38.8 mi77.5
quarryCalcium PlantJacksonville41.8 mi83.6
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
DUKE ENERGY FLORIDA INC

Permits & Sources

Every connector that's seen this project

EARLY SIGNALEnvironmental Resource Permit(FDEP ERP (Water - Individual With No Conceptual Approval Permit))

Pre-construction environmental clearance for site work. Issued = project cleared to grade; contractor typically not yet selected.

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0471695-0012026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/30d025dd