Soleta Amenity Center
SWFWMD ERP — site address pending
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 3/15/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-17SWFWMD_ERPCaptured SWFWMD_ERP_927417 from swfwmd_erp
- 2026-05-21SWFWMD_ERP_PLANSCaptured SWFWMD_PLANS_927417_2ee76502 from swfwmd_erp_plans
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
- 2 existing wet detention ponds (Pond 1 and Pond 2)
- 1 existing pond (Pond B)
- 13 proposed yard drain basins (Nyloplast)
- 1 proposed Type P manhole (STR #92)
- 1 mitered end section (STR #93)
- 1 existing Type 1 curb inlet (STR #73)
- 1 channel trench drain (27 LF Pro Series)
- wetland C-5 (5.68 AC Category III)
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 15.9 mi | 31.7 |
| sand pit | County Line Mine | Spring Hill | 16.7 mi | 33.3 |
| quarry | Central State Aggregates LLC | Zephyrhill | 21.0 mi | 42.1 |
| quarry | Tampa Cement Grinding Plant | Tampa | 21.9 mi | 43.7 |
| quarry | Brooksville Quarry | Brooksville | 29.1 mi | 58.2 |
| quarry | Brooksville South Cement Plant | Brooksville | 29.8 mi | 59.5 |
| quarry | Calcium Plant | Jacksonville | 32.8 mi | 65.6 |
| quarry | Center Hill Mine | Brooksville | 35.9 mi | 71.9 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| swfwmd_erp | SWFWMD_ERP_927417 | 2026-05-17 | Open ↗ |
| swfwmd_erp_plans | SWFWMD_PLANS_927417_2ee76502 | 2026-05-21 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Pasco
- Acreage
- 0.6 ac
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/2ee76502