Approved · unknownHILLSBOROUGH County
Cleanup (petroleum cleanup) — LADY BUGS ANTIQUES & COLLECTIBLES
6828 N FLORIDA AVE, TAMPA, FL, 33605
~9loads
fill dirt + base rock
≤1 wk
Lifecycle
Active as of May 28, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — LADY BUGS ANTIQUES & COLLECTIBLES
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
0.035 ac
Parcel 1628810000
Est truck loads
—
Needs site plan parse
Sources seen
4
Public records referencing this job
General Contractor
Not yet identified
Why this is a hauling opportunity: Base site_development/earthwork (65) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87799612 from fdep_cleanup_sites
- 2026-06-10FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87922285 from fdep_cleanup_sites
- 2026-06-12HCPACaptured HCPA_1628810000_64173960 from hcpa
- 2026-06-21HCPACaptured HCPA_1628810000_2df66ac1 from hcpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
5.2 mi
Round trip
10.5 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 5.2 mi | 10.5 |
| quarry | Central State Aggregates LLC | Zephyrhill | 16.7 mi | 33.4 |
| quarry | Caloosa Materials | Ruskin | 21.2 mi | 42.5 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 26.0 mi | 52.1 |
| sand pit | County Line Mine | Spring Hill | 29.9 mi | 59.8 |
| quarry | Four Corners | Lithia | 34.4 mi | 68.8 |
| quarry | West Florida Aggregate | Webster | 39.6 mi | 79.2 |
| quarry | Brooksville Quarry | Brooksville | 39.6 mi | 79.2 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Official source-of-truth portal
Hillsborough County Permits ↗Tampa area permits, inspections, reviews
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_87799612 | 2026-05-28 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87922285 | 2026-06-10 | Open ↗ |
| hcpa | HCPA_1628810000_64173960 | 2026-06-12 | Open ↗ |
| hcpa | HCPA_1628810000_2df66ac1 | 2026-06-21 | Open ↗ |
Parcel Detail
Hillsborough Property Appraiser
PropertyHCPA ↗
- Folio
- 1628810000
- Strap
- A-36-28-18-4F3-000000-00001.0
- Address
- 6828 N FLORIDA AVE, TAMPA
- Zip
- 33604
- Acreage
- 0.035 ac
- Sq ft
- 1,540
- Homestead
- NO
Owner of record
PEREZ YENNY ALEJANDRA ACOSTA
CASTANO TRANSPORT INC
Last sale
2022-09-26
$100(transfer)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/2df66ac1