Approved · unknownMARION County
Cleanup (petroleum cleanup) — GATE-ROBINSONS
5827 SE ABSHIER BLVD, BELLEVIEW, FL, 34420
Load estimate pending
Lifecycle
Active as of May 28, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — GATE-ROBINSONS
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Parcel 38165-000-00
Est truck loads
—
Needs site plan parse
Sources seen
12
Public records referencing this job
General Contractor
Not yet identified
Why this is a hauling opportunity: Base site_development/earthwork (65) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87797389 from fdep_cleanup_sites
- 2026-06-01MARIONPACaptured MARIONPA_38165-000-00_2d1e1e44 from marionpa
- 2026-06-13FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87950717 from fdep_cleanup_sites
- 2026-06-13MARIONPACaptured MARIONPA_38165-000-00_c865046d from marionpa
- 2026-06-16FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87981367 from fdep_cleanup_sites
- 2026-06-19MARIONPACaptured MARIONPA_38165-000-00_c8d516f9 from marionpa
- 2026-06-23FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88052815 from fdep_cleanup_sites
- 2026-06-24FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88063016 from fdep_cleanup_sites
- 2026-06-24MARIONPACaptured MARIONPA_38165-000-00_487001c4 from marionpa
- 2026-06-24MARIONPACaptured MARIONPA_38165-000-00_ad4cad0f from marionpa
- 2026-06-28FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88103812 from fdep_cleanup_sites
- 2026-06-28MARIONPACaptured MARIONPA_38165-000-00_1f6aaf4f from marionpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
NORTH MINE · OCALA
One-way
5.5 mi
Round trip
11 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | NORTH MINE | OCALA | 5.5 mi | 11 |
| sand pit | Weirsdale Sand Plant | Jacksonville | 12.9 mi | 25.7 |
| sand pit | Lynne Mine | Davenport | 13.6 mi | 27.3 |
| quarry | Stavola NW Pit | Ocala | 15.8 mi | 31.7 |
| quarry | Lowell Mine & Mill | Ocala | 19.9 mi | 39.9 |
| quarry | 328 Pit | Ocala | 20.9 mi | 41.8 |
| quarry | SUMTERVILLE QUARRY | Ocala | 21.0 mi | 41.9 |
| sand pit | Lisbon Sand | Lexington | 21.4 mi | 42.9 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_87797389 | 2026-05-28 | Open ↗ |
| marionpa | MARIONPA_38165-000-00_2d1e1e44 | 2026-06-01 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87950717 | 2026-06-13 | Open ↗ |
| marionpa | MARIONPA_38165-000-00_c865046d | 2026-06-13 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87981367 | 2026-06-16 | Open ↗ |
| marionpa | MARIONPA_38165-000-00_c8d516f9 | 2026-06-19 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_88052815 | 2026-06-23 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_88063016 | 2026-06-24 | Open ↗ |
| marionpa | MARIONPA_38165-000-00_487001c4 | 2026-06-24 | Open ↗ |
| marionpa | MARIONPA_38165-000-00_ad4cad0f | 2026-06-24 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_88103812 | 2026-06-28 | Open ↗ |
| marionpa | MARIONPA_38165-000-00_1f6aaf4f | 2026-06-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- Parcel ID
- 38165-000-00
- County
- MARION
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/2d1e1e44