Joint Coastal Permit — joint_coastal_permit (US Army Corps of Engineers, Mobile Distr)

Panama City Harbor

Load estimate pending
Lifecycle
Permitted as of Jan 29, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Joint Coastal Permit — joint_coastal_permit (US Army Corps of Engineers, Mobile Distr)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 1/29/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDEP coastal permit (joint_coastal_permit) — joint_coastal_permit. Coastal armor / sand / fill projects typically move 10K-1M+ cy. | stage=permit_issued, recent (+10) | government/public-authority project (floor 55) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_COASTAL_ENV
    Captured FDEP_COASTAL_ENV_0129413-013-JN from fdep_coastal_env

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (transfer station)
COASTAL PARASAIL, INC. RECYCLING FACILITY (PREV BAY CO) · Panama City Beach
One-way
9.8 mi
Round trip
19.7 mi
Closest import source (sand pit)
Sandhills Plant 2 · Dothan
One-way
23.6 mi
Round trip
47.2 mi
TypeNameCityOne-wayRT mi
sand pitSandhills Plant 2Dothan23.6 mi47.2
sand pitPanama City QuarryMurfresboro35.3 mi70.6
sand pitMVM Landfill, LLCDeFuniak Springs44.9 mi89.8
quarry1874 MariannaHammond49.4 mi98.8
quarryROCKY CREEK MINE AND MILLMarianna49.7 mi99.3
transfer stationCOASTAL PARASAIL, INC. RECYCLING FACILITY (PREV BAY CO)Panama City Beach9.8 mi19.7
landfillLYNN HAVEN C&D DISPOSAL FACILITYPanama City17.3 mi34.7
landfillSOUTHPORT C&D DISPOSAL FACILITYSouthport18.7 mi37.4
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_coastal_envFDEP_COASTAL_ENV_0129413-013-JN2026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)