Approved · unknownWashington County
FDOT — SR 8 (I-10) OVER CR 279 PATE POND RD. BRIDGE NO. 610050 - BR IDGE-REPAIR/REHABILITATION
Washington County — FDOT Contract E3Y01
Load estimate pending
Lifecycle
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
FDOT — SR 8 (I-10) OVER CR 279 PATE POND RD. BRIDGE NO. 610050 - BR IDGE-REPAIR/REHABILITATION
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$2.2M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — SR 8 (I-10) OVER CR 279 PATE POND RD. BRIDGE NO. 610050 - BR IDGE-REPAIR/REHABIL. Vendor: ANDERSON COLUMBIA CO., INC.. Cost: $2,218,956. | FDOT public project (+15) | size signal: $2,218,956 valuation (+12) | FDOT public project (+15) | size signal: $2,218,956 valuation (+12) | FDOT public project (+15) | size signal: $2,218,956 valuation (+12) | FDOT public project (+15) | size signal: $2,218,956 valuation (+12)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_E3Y01_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (sand pit)
Panama City Quarry · Murfresboro
One-way
16.2 mi
Round trip
32.4 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | Panama City Quarry | Murfresboro | 16.2 mi | 32.4 |
| sand pit | MVM Landfill, LLC | DeFuniak Springs | 20.6 mi | 41.3 |
| sand pit | Sandhills Plant 2 | Dothan | 22.1 mi | 44.1 |
| quarry | Jones Pit | Chiefland | 28.5 mi | 57 |
| sand pit | Mossy Head West | Dothan | 29.8 mi | 59.7 |
| sand pit | MOSSEYHEAD MINES | CENTURY | 29.8 mi | 59.7 |
| quarry | Imperial Rock Mine | Marianna | 30.3 mi | 60.7 |
| sand pit | USA Calcium | Marianna | 32.7 mi | 65.4 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_E3Y01_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Washington
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/2b8866c9