Leads/2915-52nd-ave-s-pinellas-fl-55c86415
Approved · unknownPinellas County

2915 52ND AVE S

2915 52ND AVE S

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

2915 52ND AVE S

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
0.2628 ac
Parcel 217137
Est truck loads
Needs site plan parse
Sources seen
5
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
STOKLING, ALAN
Why this is a hauling opportunity: Building permit | Connector base: 50 | Stage = permit_issued — actionable now (+10) | single-trade residential permit — capped low | single-trade residential permit — capped low | single-trade residential permit — capped low | single-trade residential permit — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21STPETE_CLICK2GOV
    Captured 25-11000316 from stpete_click2gov
  2. 2026-05-21PCPAO
    Captured PCPAO_241602_ed067537 from pcpao
  3. 2026-05-22PCPAO
    Captured PCPAO_240040_ed067537 from pcpao
  4. 2026-05-25PCPAO
    Captured PCPAO_227045_ed067537 from pcpao
  5. 2026-05-27PCPAO
    Captured PCPAO_217137_ed067537 from pcpao

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
14.4 mi
Round trip
28.8 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin14.4 mi28.8
quarryTampa Cement Grinding PlantTampa20.5 mi40.9
quarryWingate Creek MineLithia37.1 mi74.1
quarryCentral State Aggregates LLCZephyrhill40.5 mi81
quarryFour CornersLithia43.1 mi86.2
quarrySouth Pasture MineLithia44.7 mi89.5
quarryGeorgia Stone Spring Hill QuarryAtlanta 47.2 mi94.5
sand pitCounty Line MineSpring Hill49.5 mi99
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
STOKLING, ALAN
Applicant
FREEDOM SOLAR POWER LLC

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
stpete_click2gov25-110003162026-05-21Open ↗
pcpaoPCPAO_241602_ed0675372026-05-21Open ↗
pcpaoPCPAO_240040_ed0675372026-05-22Open ↗
pcpaoPCPAO_227045_ed0675372026-05-25Open ↗
pcpaoPCPAO_217137_ed0675372026-05-27Open ↗

Parcel Detail

Pinellas County Property Appraiser

PropertyPCPAO
Folio
241602
Strap
02-32-16-71640-001-0240
Address
2915 52nd Ave S
Zip
33712
Acreage
0.2628 ac
Sq ft
11,448
Year built
2004
Use
0110 Single Family ...
Subdivision
PINE PARK
Owner of record
STOKLING, ALAN
STOKLING, LORETTA
Last sale
2004-08-01
$286,900
Appraiser valuation
Just (market)
$670,804
Assessed
$260,233
Taxable
$209,511

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/2915-52nd-ave-s-pinellas-fl-55c86415