Approved · unknownCalhoun County
FDOT — SR 71 FROM S OF CR 275 TO SR 69 PEAR ST - RESURFACING
Calhoun County — FDOT Contract T3917
Load estimate pending
Lifecycle
Active as of Sep 5, 2025
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
FDOT — SR 71 FROM S OF CR 275 TO SR 69 PEAR ST - RESURFACING
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$6.6M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — SR 71 FROM S OF CR 275 TO SR 69 PEAR ST - RESURFACING. Vendor: ROBERTS AND ROBERTS, INC.. Cost: $6,617,694. | FDOT public project (+15) | size signal: $6,617,694 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $6,617,694 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $6,617,694 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $6,617,694 valuation (+20) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_T3917_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
1874 Marianna · Hammond
One-way
17.1 mi
Round trip
34.2 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | 1874 Marianna | Hammond | 17.1 mi | 34.2 |
| quarry | ROCKY CREEK MINE AND MILL | Marianna | 18.0 mi | 36 |
| sand pit | A-Mining Group II LLC. | Quincy | 26.5 mi | 53 |
| sand pit | USA Calcium | Marianna | 28.8 mi | 57.5 |
| quarry | Marianna Hi-Cal / Alternative Materials | Irving | 29.3 mi | 58.5 |
| quarry | Active Minerals Attapulgite Division | Quincy | 31.8 mi | 63.6 |
| quarry | Quincy Plant and Mines | QUINCY | 33.4 mi | 66.8 |
| sand pit | Panama City Quarry | Murfresboro | 33.5 mi | 67 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_T3917_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Calhoun
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/2790f261