Leads/270f8410
Approved · planning

North Port Emergency Operations Center

4980 City Center Blvd., North Port, FL, 34286

~246loads
fill dirt
2 wk
Lifecycle
Permitted as of Mar 25, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

North Port Emergency Operations Center

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 3/25/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
2.21 ac
Parcel 0977001030
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
CITY OF NORTH PORT
Why this is a hauling opportunity: Base unknown/other (20) | size signal: 2.2 ac disturbed, ~246 est. loads (+12) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24SWFWMD_ERP
    Captured SWFWMD_ERP_932744 from swfwmd_erp
  2. 2026-06-11SWFWMD_ERP_PLANS
    Captured SWFWMD_PLANS_932744_270f8410 from swfwmd_erp_plans

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

Export ceiling
Fill volume
Net haul
Est loads
@ 15 cy/load
Drainage features (6)
  • 1 dry retention pond
  • swales (existing along north and west property lines)
  • multiple storm drainage inlets with inlet protection
  • roof drains connecting to site storm system
  • 1 junction manhole
  • 1 concrete spillway
Plan notes: Proposed finished floor elevation is 22.40 ft NAVD88. Stormwater management area is 0.07 acres; the project connects to an existing stormwater management system per general notes.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Florida Shell & Fill Company LLC · Naples
One-way
12.6 mi
Round trip
25.2 mi
TypeNameCityOne-wayRT mi
quarryFlorida Shell & Fill Company LLCNaples12.6 mi25.2
sand pitWashington Loop MinePunta Gorda17.6 mi35.2
quarryBermont Materials AlicoPunta Gorda19.2 mi38.4
quarry4M-31 MineAlva23.2 mi46.4
sand pitWatermelon PitPunta Gorda28.0 mi55.9
quarryHalls MineNaples28.0 mi55.9
sand pitWillliams Farms Sand & Shell, Inc.PUNTA GORDA28.8 mi57.5
quarryWright Farms PitNocatee28.8 mi57.6
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
CITY OF NORTH PORT
Engineer of Record
AM ENGINEERING

Permits & Sources

Every connector that's seen this project

EARLY SIGNALWater District Environmental Permit (ERP)(SWFWMD ERP (Individual))

Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.

ConnectorRecord IDCapturedLink
swfwmd_erpSWFWMD_ERP_9327442026-05-24Open ↗
swfwmd_erp_plansSWFWMD_PLANS_932744_270f84102026-06-11Open ↗

Parcel Detail

Property records and ownership

Property
Parcel ID
0977001030
City
North Port
Acreage
2.21 ac
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/270f8410