Leads/26ffade1
Approved · application_filedPasco County

7-Eleven - Overpass Road - Modification

SWFWMD ERP — site address pending

~113loads
fill dirt
≤1 wk
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

7-Eleven - Overpass Road - Modification

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
$363K
Actual — from source record
Acreage
1.02 ac
Parcel 33-25-20-0010-00000-1440
Est truck loads
Needs site plan parse
Sources seen
3
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
Orenco Responsive LLC
Why this is a hauling opportunity: Base unknown/other (20) | size signal: 1.0 ac disturbed, $363,221 valuation, ~113 est. loads (+12)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-17SWFWMD_ERP
    Captured SWFWMD_ERP_880782 from swfwmd_erp
  2. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_33-25-20-0010-00000-1440_26ffade1 from fl_dor_cadastral
  3. 2026-06-01PASCOPA
    Captured PASCOPA_33-25-20-0010-00000-1440_26ffade1 from pascopa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Central State Aggregates LLC · Zephyrhill
One-way
4.9 mi
Round trip
9.7 mi
TypeNameCityOne-wayRT mi
quarryCentral State Aggregates LLCZephyrhill4.9 mi9.7
quarryGeorgia Stone Spring Hill QuarryAtlanta 13.0 mi26.1
sand pitCounty Line MineSpring Hill18.9 mi37.7
quarryWest Florida AggregateWebster19.8 mi39.6
quarryBrooksville South Cement PlantBrooksville22.7 mi45.5
quarryBrooksville QuarryBrooksville22.8 mi45.6
quarryTampa Cement Grinding PlantTampa24.3 mi48.7
quarryCalcium PlantJacksonville26.0 mi52
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
Orenco Responsive LLC
5094 Lake Catalina Dr Apt B BOCA RATON, FL 33496-2466

Permits & Sources

Every connector that's seen this project

EARLY SIGNALWater District Environmental Permit (ERP)(SWFWMD ERP (Individual))

Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
swfwmd_erpSWFWMD_ERP_8807822026-05-17Open ↗
fl_dor_cadastralFDOR_33-25-20-0010-00000-1440_26ffade12026-05-28Open ↗
pascopaPASCOPA_33-25-20-0010-00000-1440_26ffade12026-06-01Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
33-25-20-0010-00000-1440
Strap
33-25-20-0010-00000-1440
Address
Acreage
1.02 ac
Sq ft
44,431
Owner of record
PVMR HOLDINGS LLC
Last sale

No sale on record

Appraiser valuation
Just (market)
$772,450

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/26ffade1