Approved · planningPasco County

Kenton Road 1st Extension Modification

Intersection of Elam Road & Kenton Road, Pasco County, FL

~1.4kloads
fill dirt
9 wk
Lifecycle
Permitted as of Apr 16, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Kenton Road 1st Extension Modification

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 4/16/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
12.7 ac
Parcel 28-25-20-0000-00400-0010, 28-25-20-0000-00400-0025, 28-25-20-0000-00400-0026, 28-25-20-0000-00400-0029, 28-25-20-0000-00400-0040, 28-25-20-0000-00400-0050, 28-25-20-0000-00900-0000, 28-25-20-0000-01000-0010, 28-25-20-0000-49900-0010
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
Pulte Home Company, LLC
Why this is a hauling opportunity: Base unknown/other (20) | size signal: 13 ac disturbed, ~1411 est. loads (+25) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-17SWFWMD_ERP
    Captured SWFWMD_ERP_928687 from swfwmd_erp
  2. 2026-05-21SWFWMD_ERP_PLANS
    Captured SWFWMD_PLANS_928687_26d5340d from swfwmd_erp_plans

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

Export ceiling
Fill volume
Net haul
Est loads
@ 15 cy/load
Utility trenches (each LF ≈ 1 cy spoil)
reclaimed
2,200 LF
force main
2,400 LF
water main
3,200 LF
Drainage features (4)
  • Multiple curb inlets (approximately 30 numbered structures including curb inlets
  • manholes
  • junction boxes
  • and one mitered end section); 5 existing wet detention/stormwater ponds referenced on master drainage plan; 1 existing floodplain pond; storm drainage pipes ranging from 18-inch to 48-inch RCP
Plan notes: Site is noted as 'SITE TO BE MASS GRADED UNDER PREVIOUS APPROVAL' per the Aprile Mass Grading plans (ERP No. 43045142.001); earthwork quantities for this roadway construction plan set are not tabulated separately. General notes specify six soil reuse categories including structural sand fill (SP/SP-SM/SM, A-2-4/A-2-6/A-3) suitable for embankment and non-structural clayey materials requiring disposal in landscape/pond areas.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Central State Aggregates LLC · Zephyrhill
One-way
5.2 mi
Round trip
10.4 mi
TypeNameCityOne-wayRT mi
quarryCentral State Aggregates LLCZephyrhill5.2 mi10.4
quarryGeorgia Stone Spring Hill QuarryAtlanta 13.4 mi26.8
quarryWest Florida AggregateWebster18.9 mi37.7
sand pitCounty Line MineSpring Hill19.2 mi38.5
quarryBrooksville South Cement PlantBrooksville22.5 mi45
quarryBrooksville QuarryBrooksville22.6 mi45.2
quarryTampa Cement Grinding PlantTampa25.1 mi50.2
quarryCenter Hill MineBrooksville25.6 mi51.1
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
Pulte Home Company, LLC
People (6)
  • ROY F · P KRAG
  • DAVID · V EBLING
  • HOWARD · C JOHNSON, C
  • JAMES · C GROSFELD
  • MARK · S SHAEVSKY
  • RICHARD · T STAKY
Engineer of Record
Clearview Land Design, P.L.

Permits & Sources

Every connector that's seen this project

EARLY SIGNALWater District Environmental Permit (ERP)(SWFWMD ERP (Individual))

Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
swfwmd_erpSWFWMD_ERP_9286872026-05-17Open ↗
swfwmd_erp_plansSWFWMD_PLANS_928687_26d5340d2026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
Parcel ID
28-25-20-0000-00400-0010, 28-25-20-0000-00400-0025, 28-25-20-0000-00400-0026, 28-25-20-0000-00400-0029, 28-25-20-0000-00400-0040, 28-25-20-0000-00400-0050, 28-25-20-0000-00900-0000, 28-25-20-0000-01000-0010, 28-25-20-0000-49900-0010
County
Pasco
City
Pasco County
Acreage
12.7 ac
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/26d5340d