Kenton Road 1st Extension Modification
Intersection of Elam Road & Kenton Road, Pasco County, FL
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 4/16/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Not yet identified
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-17SWFWMD_ERPCaptured SWFWMD_ERP_928687 from swfwmd_erp
- 2026-05-21SWFWMD_ERP_PLANSCaptured SWFWMD_PLANS_928687_26d5340d from swfwmd_erp_plans
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
- Multiple curb inlets (approximately 30 numbered structures including curb inlets
- manholes
- junction boxes
- and one mitered end section); 5 existing wet detention/stormwater ponds referenced on master drainage plan; 1 existing floodplain pond; storm drainage pipes ranging from 18-inch to 48-inch RCP
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Central State Aggregates LLC | Zephyrhill | 5.2 mi | 10.4 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 13.4 mi | 26.8 |
| quarry | West Florida Aggregate | Webster | 18.9 mi | 37.7 |
| sand pit | County Line Mine | Spring Hill | 19.2 mi | 38.5 |
| quarry | Brooksville South Cement Plant | Brooksville | 22.5 mi | 45 |
| quarry | Brooksville Quarry | Brooksville | 22.6 mi | 45.2 |
| quarry | Tampa Cement Grinding Plant | Tampa | 25.1 mi | 50.2 |
| quarry | Center Hill Mine | Brooksville | 25.6 mi | 51.1 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| swfwmd_erp | SWFWMD_ERP_928687 | 2026-05-17 | Open ↗ |
| swfwmd_erp_plans | SWFWMD_PLANS_928687_26d5340d | 2026-05-21 | Open ↗ |
Parcel Detail
Property records and ownership
- Parcel ID
- 28-25-20-0000-00400-0010, 28-25-20-0000-00400-0025, 28-25-20-0000-00400-0026, 28-25-20-0000-00400-0029, 28-25-20-0000-00400-0040, 28-25-20-0000-00400-0050, 28-25-20-0000-00900-0000, 28-25-20-0000-01000-0010, 28-25-20-0000-49900-0010
- County
- Pasco
- City
- Pasco County
- Acreage
- 12.7 ac
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/26d5340d