Leads/25883f43
Approved · planning

MAJOR MODIFICATION

3820 NORTHDALE BLVD SUITE 100B, TAMPA, FL, 33624

Load estimate pending
Lifecycle
Permitted as of Dec 22, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

MAJOR MODIFICATION

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 12/22/2025 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
CEMEX CONSTRUCTION MATERIALS FLORIDA, LLC
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0211510-019-EM from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Mid-Coast Aggregates LLC-Mazak Mine · Webster
One-way
4.7 mi
Round trip
9.3 mi
TypeNameCityOne-wayRT mi
quarryMid-Coast Aggregates LLC-Mazak MineWebster4.7 mi9.3
quarrySt Catherine MineBrooksville6.0 mi12
quarrySUMTERVILLE MINEOcala6.8 mi13.6
quarrySumterville Cement PlantSumterville6.8 mi13.6
quarrySUMTERVILLE QUARRYOcala7.9 mi15.7
sand pitOkahumpkaLeesburg9.3 mi18.6
quarryWest Florida AggregateWebster12.7 mi25.3
sand pitAstatula Sand PlantJacksonville17.1 mi34.2
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
CEMEX CONSTRUCTION MATERIALS FLORIDA, LLC
Aggregate / Pit
1720 Centrepark Drive East West Palm Beach, FL 33401

Permits & Sources

Every connector that's seen this project

EARLY SIGNALEnvironmental Resource Permit(FDEP ERP (Water - ERP Modifications))

Pre-construction environmental clearance for site work. Issued = project cleared to grade; contractor typically not yet selected.

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0211510-019-EM2026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/25883f43