Bushnell Truss - Webster Plant Site Improvements
7795 State Road 471, Webster, FL, 33597
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 4/28/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-24SWFWMD_ERPCaptured SWFWMD_ERP_931750 from swfwmd_erp
- 2026-06-08SWFWMD_ERP_PLANSCaptured SWFWMD_PLANS_931750_2515beee from swfwmd_erp_plans
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
- 1 wet detention pond (TOB=87.00
- NWL=83.50
- SHWL=79.50
- BOTTOM=78.50); multiple swales (treatment swale
- runoff bypass swales
- 20-ft wide swale with 8-ft bottom
- 30-ft wide swale with 10-ft bottom
- 15-ft wide swale with 4:1 max side slopes
- spreader swale); 1 outfall control structure (modified FDOT Type E
- weir=83.9
- inv=82.0); 1 Contech water polisher; multiple Type F inlets (at least 8 visible on grading plan); 2 mitered end sections; 1 storm manhole
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | West Florida Aggregate | Webster | 5.4 mi | 10.8 |
| quarry | Mid-Coast Aggregates LLC-Mazak Mine | Webster | 9.4 mi | 18.8 |
| quarry | St Catherine Mine | Brooksville | 16.0 mi | 32 |
| quarry | SUMTERVILLE MINE | Ocala | 19.0 mi | 38.1 |
| quarry | Sumterville Cement Plant | Sumterville | 19.0 mi | 38.1 |
| sand pit | 474 Sand Mine | Brooksville | 19.3 mi | 38.5 |
| sand pit | Lake Sand Plant | Jacksonville | 19.4 mi | 38.8 |
| quarry | SUMTERVILLE QUARRY | Ocala | 19.6 mi | 39.2 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| swfwmd_erp | SWFWMD_ERP_931750 | 2026-05-24 | Open ↗ |
| swfwmd_erp_plans | SWFWMD_PLANS_931750_2515beee | 2026-06-08 | Open ↗ |
Parcel Detail
Property records and ownership
- Parcel ID
- Q19-060, Q19-090 & Q19-091
- City
- Webster
- Acreage
- 14.055 ac