CCCL — Fill (Don Campagna)
FL coastal — CCCL -8036859
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 11/12/2025 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Not yet identified
Not yet identified
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_CCCLCaptured FDEP_CCCL_-8036859 from fdep_cccl
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Caloosa Materials | Ruskin | 24.2 mi | 48.3 |
| quarry | Tampa Cement Grinding Plant | Tampa | 24.4 mi | 48.8 |
| quarry | Central State Aggregates LLC | Zephyrhill | 41.8 mi | 83.6 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 44.5 mi | 88.9 |
| sand pit | County Line Mine | Spring Hill | 45.5 mi | 91 |
| quarry | Wingate Creek Mine | Lithia | 47.5 mi | 95 |
| landfill | ANGELO'S RECYCLED MATERIALS - LARGO MRF | Largo | 6.8 mi | 13.6 |
| transfer station | A & S OIL RECOVERY OF FLORIDA INC | St Petersburg | 8.0 mi | 16 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cccl | FDEP_CCCL_-8036859 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/24651b36