Leads/22c46a47
Approved · application_filedHighlands County

Fisheating Creek Mitigation Bank-Initial Credit Release

SWFWMD ERP — site address pending

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

Fisheating Creek Mitigation Bank-Initial Credit Release

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
Southern States Land & Timber, LLC
Why this is a hauling opportunity: Base unknown/other (20) | wetland mitigation/nourishment (+15)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-17SWFWMD_ERP
    Captured SWFWMD_ERP_940362 from swfwmd_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
Witherspoon Sand Plant · Jacksonville
One-way
21.5 mi
Round trip
42.9 mi
TypeNameCityOne-wayRT mi
sand pitWitherspoon Sand PlantJacksonville21.5 mi42.9
sand pitOrtona Sand CoDavenport21.5 mi42.9
sand pitBoar Hammock Sand MineJupiter22.5 mi45
quarryFarabee Mine & Shell LLCPunta Gorda24.5 mi49
sand pitTomahawk 29 MineFort Myers25.4 mi50.8
quarryNeal AggregatesPunta Gorda25.5 mi51.1
sand pitBermont Excavating Site 2Punta Gorda26.2 mi52.5
quarryStallings ClaimLabelle26.4 mi52.7
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
Southern States Land & Timber, LLC
750 PARK OF COMMERCE BLVD C/O NASON YEAGER GERSON HARRIS & FUMERO, PA STE 210 BOCA RATON, FL 33487

Permits & Sources

Every connector that's seen this project

EARLY SIGNALWater District Environmental Permit (ERP)(SWFWMD ERP (Minor System))

Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.

Official source-of-truth portal
Highlands County Permits
Sebring Building Department
ConnectorRecord IDCapturedLink
swfwmd_erpSWFWMD_ERP_9403622026-05-17Open ↗

Parcel Detail

Property records and ownership

Property
County
Highlands
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/22c46a47