Leads/2222fb0c
Approved · unknownBroward County

FDOT — TSM&O ADD AUX LANES TO S TPK(SR91) IN BROWARD CNTY, MP 47-51 - ADD AUXILIARY LANE(S)

Broward County — FDOT Contract E8U74

Load estimate pending
Lifecycle
Active as of Sep 20, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

FDOT — TSM&O ADD AUX LANES TO S TPK(SR91) IN BROWARD CNTY, MP 47-51 - ADD AUXILIARY LANE(S)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$127.2M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT roadway contract — TSM&O ADD AUX LANES TO S TPK(SR91) IN BROWARD CNTY, MP 47-51 - ADD AUXILIARY LA. Vendor: RYAN INC. SOUTHERN. Cost: $127,160,668. | FDOT public project (+15) | size signal: $127,160,668 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $127,160,668 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $127,160,668 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $127,160,668 valuation (+20) | stage=under_construction, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_E8U74_1 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
WHITE ROCK QUARRIES · West Palm Beach
One-way
11.5 mi
Round trip
23 mi
TypeNameCityOne-wayRT mi
quarryWHITE ROCK QUARRIESWest Palm Beach11.5 mi23
quarryFEC QUARRYMIAMI11.8 mi23.5
quarryPENNSUCO CEMENT PLANTMedley12.1 mi24.3
quarryPENNSUCO QUARRYMedley12.1 mi24.3
quarryEpic Stoneworks, Inc.Cutler Bay16.8 mi33.6
quarryMiami QuarryJacksonville17.0 mi34
quarryMiami Cement PlantMiami18.9 mi37.9
quarryKrome QuarryMIAMI26.9 mi53.7
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Broward County Permits
Fort Lauderdale area Building Division
ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_E8U74_12026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Broward
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/2222fb0c