Leads/21a8123c
Approved · unknownLEE County

Mitigation bank — Little Pine Island (1,565 ac)

Little Pine Island, LEE County, FL

Load estimate pending
Lifecycle
Permitted as of Feb 6, 1996
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Mitigation bank — Little Pine Island (1,565 ac)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 2/6/1996 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Mitigation bank — 1,565 ac of wetland restoration. Multi-year project with fill / grading / water control structures. Contact: Sheila O'Connor. | stage=permit_issued, but stale (30y old) | single-trade residential permit — capped low | government/public-authority project (floor 55) | stage=permit_issued, but stale (30y old) | single-trade residential permit — capped low | government/public-authority project (floor 55) | stage=permit_issued, but stale (30y old) | single-trade residential permit — capped low | government/public-authority project (floor 55) | stage=permit_issued, but stale (30y old) | single-trade residential permit — capped low | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_MITIGATION_BANKS
    Captured FDEP_MITBANK_198719-082 from fdep_mitigation_banks

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
ALICO ROAD QUARRY · Miami
One-way
22.5 mi
Round trip
45 mi
TypeNameCityOne-wayRT mi
quarryALICO ROAD QUARRYMiami22.5 mi45
quarryJayrockPunta Gorda23.1 mi46.3
quarrySRM Materials Punta GordaMurfreesboro23.9 mi47.7
quarryFort Myers MineJacksonville24.5 mi49
quarryBermont Materials AlicoPunta Gorda24.6 mi49.3
quarryFort Myers QuarryFort Myers25.3 mi50.7
sand pitWashington Loop MinePunta Gorda25.7 mi51.3
quarryFlorida Shell & Fill Company LLCNaples27.7 mi55.4
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Lee County Permits
Fort Myers / Cape Coral permit search
ConnectorRecord IDCapturedLink
fdep_mitigation_banksFDEP_MITBANK_198719-0822026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
LEE
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/21a8123c