Approved · unknownPasco County
FDOT — US19/SR55 OVER PITHLACHASCOTEE RIVER BR#140005 SUBSTRUCTURE REPAIR - BRIDGE-REPAIR/REHABILITATION
Pasco County — FDOT Contract E7Q32
Load estimate pending
Lifecycle
Completed as of Oct 6, 2025
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
FDOT — US19/SR55 OVER PITHLACHASCOTEE RIVER BR#140005 SUBSTRUCTURE REPAIR - BRIDGE-REPAIR/REHABILITATION
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$1.7M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — US19/SR55 OVER PITHLACHASCOTEE RIVER BR#140005 SUBSTRUCTURE REPAIR - BRIDGE-REPA. Vendor: TITAN CONSTRUCTION MANAGEMENT L. Cost: $1,728,143. | FDOT public project (+15) | size signal: $1,728,143 valuation (+12) | FDOT public project (+15) | size signal: $1,728,143 valuation (+12) | FDOT public project (+15) | size signal: $1,728,143 valuation (+12) | FDOT public project (+15) | size signal: $1,728,143 valuation (+12)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_E7Q32_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
14.8 mi
Round trip
29.6 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | County Line Mine | Spring Hill | 14.8 mi | 29.6 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 16.5 mi | 33.1 |
| quarry | Central State Aggregates LLC | Zephyrhill | 26.6 mi | 53.2 |
| quarry | Brooksville Quarry | Brooksville | 27.7 mi | 55.5 |
| quarry | Brooksville South Cement Plant | Brooksville | 28.6 mi | 57.1 |
| quarry | Tampa Cement Grinding Plant | Tampa | 28.8 mi | 57.5 |
| quarry | Calcium Plant | Jacksonville | 31.2 mi | 62.4 |
| quarry | Center Hill Mine | Brooksville | 35.1 mi | 70.3 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_E7Q32_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Pasco
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/1f7c4826