Leads/1bade57a
Approved · unknownPINELLAS County

USACE 404 — BARTLETT LAKE

2000 7TH ST S, SAINT PETERSBURG, FL, 33705

~8.7kloads
fill dirt + base rock
~13 mo
Lifecycle
Permitted as of Jun 4, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

USACE 404 — BARTLETT LAKE

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 6/4/2024 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
$7.1M
Actual — from source record
Acreage
34.6587 ac
Parcel 307868
Est truck loads
Needs site plan parse
Sources seen
5
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
ST PETERSBURG, CITY OF
Why this is a hauling opportunity: Base public_works/earthwork (65) | size signal: 35 ac disturbed, $7,140,346 valuation, ~8665 est. loads (+25) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0444940-002-EE from fdep_spgp
  2. 2026-06-03PCPAO
    Captured PCPAO_431178_1bade57a from pcpao
  3. 2026-06-08FL_DOR_CADASTRAL
    Captured FDOR_17 31 30 00000 340 0000_1bade57a from fl_dor_cadastral
  4. 2026-06-28PCPAO
    Captured PCPAO_308181_1bade57a from pcpao
  5. 2026-07-02PCPAO
    Captured PCPAO_307868_1bade57a from pcpao

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
12.7 mi
Round trip
25.3 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin12.7 mi25.3
quarryTampa Cement Grinding PlantTampa17.6 mi35.2
quarryWingate Creek MineLithia36.1 mi72.1
quarryCentral State Aggregates LLCZephyrhill37.7 mi75.4
quarryFour CornersLithia40.9 mi81.8
quarrySouth Pasture MineLithia43.0 mi85.9
quarryGeorgia Stone Spring Hill QuarryAtlanta 44.9 mi89.7
sand pitCounty Line MineSpring Hill47.3 mi94.6
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
ST PETERSBURG, CITY OF

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0444940-002-EE2026-05-28Open ↗
pcpaoPCPAO_431178_1bade57a2026-06-03Open ↗
fl_dor_cadastralFDOR_17 31 30 00000 340 0000_1bade57a2026-06-08Open ↗
pcpaoPCPAO_308181_1bade57a2026-06-28Open ↗
pcpaoPCPAO_307868_1bade57a2026-07-02Open ↗

Parcel Detail

Pinellas County Property Appraiser

PropertyPCPAO
Folio
431178
Strap
30-31-17-00000-340-0000
Address
2000 7th St S
Zip
33705
Acreage
34.6587 ac
Sq ft
1,509,733
Year built
1982
Use
8913 City Gov't - N ...
Subdivision
NONE
Owner of record
ST PETERSBURG, CITY OF
Last sale

No sale on record

Appraiser valuation
Just (market)
$7,140,346
Assessed
$6,808,062
Taxable
$0

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/1bade57a