Approved · unknownMarion County
FDOT — CR 484 FROM SW 20TH AVENUE TO CR 475A - INTERCHANGE IMPROVEM ENT
Marion County — FDOT Contract T5597
Load estimate pending
Lifecycle
Completed as of Jan 4, 2023
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
FDOT — CR 484 FROM SW 20TH AVENUE TO CR 475A - INTERCHANGE IMPROVEM ENT
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$11.1M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT earthwork contract — CR 484 FROM SW 20TH AVENUE TO CR 475A - INTERCHANGE IMPROVEM ENT. Vendor: ANDERSON COLUMBIA CO., INC.. Cost: $11,085,495. | FDOT public project (+15) | size signal: $11,085,495 valuation (+20) | FDOT public project (+15) | size signal: $11,085,495 valuation (+20) | FDOT public project (+15) | size signal: $11,085,495 valuation (+20)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_T5597_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
NORTH MINE · OCALA
One-way
8.2 mi
Round trip
16.3 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | NORTH MINE | OCALA | 8.2 mi | 16.3 |
| quarry | Manko Co Sec 5 Mine/Phos | Ocala | 15.8 mi | 31.7 |
| quarry | Stavola NW Pit | Ocala | 16.7 mi | 33.4 |
| quarry | 328 Pit | Ocala | 16.8 mi | 33.6 |
| sand pit | Weirsdale Sand Plant | Jacksonville | 18.3 mi | 36.6 |
| quarry | SUMTERVILLE QUARRY | Ocala | 19.3 mi | 38.6 |
| sand pit | Lynne Mine | Davenport | 19.9 mi | 39.9 |
| quarry | SUMTERVILLE MINE | Ocala | 20.2 mi | 40.4 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_T5597_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Marion
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/1b94960e