Leads/1a5f1d87
Approved · unknown

Joint Coastal Permit — joint_coastal_permit (Department of Environmental Resources Ma)

PB-151

Load estimate pending
Lifecycle
Permitted as of Jul 30, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Joint Coastal Permit — joint_coastal_permit (Department of Environmental Resources Ma)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 7/30/2025 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDEP coastal permit (joint_coastal_permit) — joint_coastal_permit. Coastal armor / sand / fill projects typically move 10K-1M+ cy. | stage=permit_issued, recent (+10) | government/public-authority project (floor 55) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_COASTAL_ENV
    Captured FDEP_COASTAL_ENV_0311339-005-JN from fdep_coastal_env

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Palm Beach Aggregates LLC · Jacksonville
One-way
23.5 mi
Round trip
47.1 mi
TypeNameCityOne-wayRT mi
quarryPalm Beach Aggregates LLCJacksonville23.5 mi47.1
sand pitPalm City MineGreenacres40.9 mi81.8
sand pitMC320 MinePalm City41.0 mi82.1
quarryStar QuarriesSOUTH BAY43.8 mi87.5
quarryFive Stones Mine, LLC.Tinton Falls45.3 mi90.6
quarryWHITE ROCK QUARRIESWest Palm Beach46.4 mi92.7
quarry1412 Canal PointHammond47.3 mi94.7
quarryFEC QUARRYMIAMI49.1 mi98.2
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_coastal_envFDEP_COASTAL_ENV_0311339-005-JN2026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/1a5f1d87