ST PETE BOAT SHOW DOCK MOD
400 1ST STREET SOUTH, ST. PETERSBURG, FL, 33701
- Filed
- Permitted
- Active
- Completed
Paperwork in — not yet approved
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 3/20/2025 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-24FDEP_ERPCaptured FDEP_ERP_0152415-015 from fdep_erp
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Caloosa Materials | Ruskin | 12.5 mi | 24.9 |
| quarry | Tampa Cement Grinding Plant | Tampa | 16.3 mi | 32.7 |
| quarry | Wingate Creek Mine | Lithia | 36.1 mi | 72.3 |
| quarry | Central State Aggregates LLC | Zephyrhill | 36.4 mi | 72.8 |
| quarry | Four Corners | Lithia | 40.3 mi | 80.6 |
| quarry | South Pasture Mine | Lithia | 42.6 mi | 85.2 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 43.6 mi | 87.2 |
| sand pit | County Line Mine | Spring Hill | 46.1 mi | 92.2 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Pre-construction environmental clearance for site work. Issued = project cleared to grade; contractor typically not yet selected.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_erp | FDEP_ERP_0152415-015 | 2026-05-24 | Open ↗ |
Parcel Detail
Property records and ownership
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/1986979e