Leads/169-80th-ave-n-pinellas-fl-dabab707
Approved · unknownPinellas County

169 80TH AVE N

169 80TH AVE N

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

169 80TH AVE N

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Parcel 30-30-17-75528-003-0210
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
MC2 DESIGN & BUILD
Why this is a hauling opportunity: Building permit | Connector base: 50 | Stage = permit_issued — actionable now (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-31STPETE_CLICK2GOV
    Captured 21-05000837 from stpete_click2gov

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
13.4 mi
Round trip
26.8 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa13.4 mi26.8
quarryCaloosa MaterialsRuskin15.6 mi31.1
quarryCentral State Aggregates LLCZephyrhill32.3 mi64.7
quarryGeorgia Stone Spring Hill QuarryAtlanta 38.4 mi76.8
quarryWingate Creek MineLithia39.5 mi79
sand pitCounty Line MineSpring Hill40.7 mi81.5
quarryFour CornersLithia41.1 mi82.2
quarrySouth Pasture MineLithia44.3 mi88.7
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Applicant
MC2 DESIGN & BUILD

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
stpete_click2gov21-050008372026-05-31Open ↗

Parcel Detail

Property records and ownership

Property
Parcel ID
30-30-17-75528-003-0210
County
Pinellas
City
St. Petersburg
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/169-80th-ave-n-pinellas-fl-dabab707