169 80TH AVE N
169 80TH AVE N
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-31STPETE_CLICK2GOVCaptured 21-05000837 from stpete_click2gov
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 13.4 mi | 26.8 |
| quarry | Caloosa Materials | Ruskin | 15.6 mi | 31.1 |
| quarry | Central State Aggregates LLC | Zephyrhill | 32.3 mi | 64.7 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 38.4 mi | 76.8 |
| quarry | Wingate Creek Mine | Lithia | 39.5 mi | 79 |
| sand pit | County Line Mine | Spring Hill | 40.7 mi | 81.5 |
| quarry | Four Corners | Lithia | 41.1 mi | 82.2 |
| quarry | South Pasture Mine | Lithia | 44.3 mi | 88.7 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| stpete_click2gov | 21-05000837 | 2026-05-31 | Open ↗ |
Parcel Detail
Property records and ownership
- Parcel ID
- 30-30-17-75528-003-0210
- County
- Pinellas
- City
- St. Petersburg
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/169-80th-ave-n-pinellas-fl-dabab707