Leads/13ddb826
Approved · planning

RIVERCREST PARK IMPROVEMENTS

4802 N RIVER BLVD, TAMPA, FL, 33603

Load estimate pending
Lifecycle
Permitted as of May 30, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

RIVERCREST PARK IMPROVEMENTS

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 5/30/2025 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
CITY OF TAMPA
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55) | unknown type, no size signal — capped <40

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0449136-001-EI from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
4.0 mi
Round trip
8 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa4.0 mi8
quarryCentral State Aggregates LLCZephyrhill18.2 mi36.5
quarryCaloosa MaterialsRuskin19.8 mi39.6
quarryGeorgia Stone Spring Hill QuarryAtlanta 27.5 mi55
sand pitCounty Line MineSpring Hill31.3 mi62.5
quarryFour CornersLithia34.1 mi68.3
quarrySouth Pasture MineLithia39.7 mi79.4
quarryWingate Creek MineLithia39.9 mi79.7
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
CITY OF TAMPA

Permits & Sources

Every connector that's seen this project

EARLY SIGNALEnvironmental Resource Permit(FDEP ERP (Water - Individual With No Conceptual Approval Permit))

Pre-construction environmental clearance for site work. Issued = project cleared to grade; contractor typically not yet selected.

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0449136-001-EI2026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/13ddb826