Leads/1201-brickell-fl-126d6abe
Approved · unknown

1201 BRICKELL

1201 BRICKELL BAY DR, MIAMI, FL, 33131

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

1201 BRICKELL

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
1201 BRICKELL
The story

The 1201 Brickell project in Miami, FL, is a site development endeavor focused on stormwater management and is currently under construction. This project presents significant hauling opportunities for providers due to its active Construction General Permit (CGP) indicating strong earthwork requirements. The key contact for this project is the owner/developer, 1201 Brickell, reachable at (305) 358-7710.

Why this is a hauling opportunity: Base site_development/stormwater (40)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21NPDES_STORMWATER
    Captured FLR10YJ57 from npdes_stormwater

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Epic Stoneworks, Inc. · Cutler Bay
One-way
8.0 mi
Round trip
16 mi
TypeNameCityOne-wayRT mi
quarryEpic Stoneworks, Inc.Cutler Bay8.0 mi16
quarryMiami QuarryJacksonville12.5 mi25
quarryFEC QUARRYMIAMI13.4 mi26.7
quarryPENNSUCO QUARRYMedley13.7 mi27.3
quarryPENNSUCO CEMENT PLANTMedley13.7 mi27.3
quarryMiami Cement PlantMiami14.5 mi29
quarryWHITE ROCK QUARRIESWest Palm Beach17.8 mi35.6
quarryKrome QuarryMIAMI18.9 mi37.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Permits & Sources

Every connector that's seen this project

ACTIVEStormwater Construction Notice (NPDES)(NPDES Construction General Permit (CGP))

Filed days before land disturbance begins on sites over 1 acre. One of the strongest 'trucks imminent' signals there is.

ConnectorRecord IDCapturedLink
npdes_stormwaterFLR10YJ572026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
City
MIAMI
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/1201-brickell-fl-126d6abe