Leads/10081c82
Approved · application_filedHillsborough County

Add Contractor License To a Record

Tampa Accela Building permit BLDLP-26-006600

Load estimate pending
Lifecycle
Completed as of May 20, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

No geo coordinates yet — geocoding runs nightly once an address or parcel match lands.

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
13
Public records referencing this job
General Contractor
DESIGN ALUMINUM EXCHANGE
Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base unknown/other (20)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-20TAMPA_ACCELA
    Captured BLDLP-26-006600 from tampa_accela
  2. 2026-05-23TAMPA_ACCELA
    Captured BLDLP-26-006694 from tampa_accela
  3. 2026-05-23TAMPA_ACCELA
    Captured BLDLP-26-006676 from tampa_accela
  4. 2026-05-23TAMPA_ACCELA
    Captured BLDLP-26-006680 from tampa_accela
  5. 2026-05-23TAMPA_ACCELA
    Captured BLDLP-26-006702 from tampa_accela
  6. 2026-05-23TAMPA_ACCELA
    Captured BLDLP-26-006673 from tampa_accela
  7. 2026-05-23TAMPA_ACCELA
    Captured BLDLP-26-006674 from tampa_accela
  8. 2026-05-23TAMPA_ACCELA
    Captured BLDLP-26-006675 from tampa_accela
  9. 2026-05-23TAMPA_ACCELA
    Captured BLDLP-26-006699 from tampa_accela
  10. 2026-05-23TAMPA_ACCELA
    Captured BLDLP-26-006701 from tampa_accela
  11. 2026-05-23TAMPA_ACCELA
    Captured BLDLP-26-006698 from tampa_accela
  12. 2026-05-23TAMPA_ACCELA
    Captured BLDLP-26-006667 from tampa_accela
  13. 2026-05-23TAMPA_ACCELA
    Captured BLDLP-26-006669 from tampa_accela

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Project has no geo coordinates yet — material sourcing needs an address or parcel centroid to find nearby sources.

Contact Graph

Who's involved and how

Contractor
DESIGN ALUMINUM EXCHANGE

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
tampa_accelaBLDLP-26-0066002026-05-20Open ↗
tampa_accelaBLDLP-26-0066942026-05-23Open ↗
tampa_accelaBLDLP-26-0066762026-05-23Open ↗
tampa_accelaBLDLP-26-0066802026-05-23Open ↗
tampa_accelaBLDLP-26-0067022026-05-23Open ↗
tampa_accelaBLDLP-26-0066732026-05-23Open ↗
tampa_accelaBLDLP-26-0066742026-05-23Open ↗
tampa_accelaBLDLP-26-0066752026-05-23Open ↗
tampa_accelaBLDLP-26-0066992026-05-23Open ↗
tampa_accelaBLDLP-26-0067012026-05-23Open ↗
tampa_accelaBLDLP-26-0066982026-05-23Open ↗
tampa_accelaBLDLP-26-0066672026-05-23Open ↗
tampa_accelaBLDLP-26-0066692026-05-23Open ↗

Parcel Detail

Property records and ownership

Property
County
Hillsborough
City
Tampa
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/10081c82