Approved · unknownPolk County
FDOT — RESURFACE POLK PARKWAY (SR 570) (MP 8 TO MP 17) POLK COUNTY - RESURFACING
Polk County — FDOT Contract E8V21
Load estimate pending
Lifecycle
Active as of Apr 28, 2025
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
FDOT — RESURFACE POLK PARKWAY (SR 570) (MP 8 TO MP 17) POLK COUNTY - RESURFACING
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$16.1M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — RESURFACE POLK PARKWAY (SR 570) (MP 8 TO MP 17) POLK COUNTY - RESURFACING. Vendor: C.W. ROBERTS CONTRACTING, INC.. Cost: $16,112,209. | FDOT public project (+15) | size signal: $16,112,209 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $16,112,209 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $16,112,209 valuation (+20) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_E8V21_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Four Corners · Lithia
One-way
16.8 mi
Round trip
33.5 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Four Corners | Lithia | 16.8 mi | 33.5 |
| sand pit | Haines City Mine | Davenport | 20.6 mi | 41.2 |
| sand pit | Gator Sand Mine | Brooksville | 22.4 mi | 44.7 |
| sand pit | SILICA PLANT | Davenport | 22.9 mi | 45.9 |
| sand pit | Davenport Sand Mine | Brooksville | 23.2 mi | 46.4 |
| quarry | FLINT PLANT | Davenport | 23.7 mi | 47.3 |
| sand pit | Green Bay Mine | Davenport | 24.3 mi | 48.6 |
| quarry | South Pasture Mine | Lithia | 24.5 mi | 49 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_E8V21_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Polk
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/0e368478