Leads/0dbb7c05
Approved · planningPasco County

ZEPHYRHILLS CLOCK PLAZA

5232 8TH ST, ZEPHYRHILLS, FL, 33542

~18loads
fill dirt
≤1 wk
Lifecycle
Permitted as of Dec 28, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

ZEPHYRHILLS CLOCK PLAZA

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 12/28/2025 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
$87K
Actual — from source record
Acreage
0.16 ac
Parcel 11-26-21-0010-16800-0230
Est truck loads
Needs site plan parse
Sources seen
4
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
CITY OF ZEPHYRHILLS
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55) | unknown type, no size signal — capped <40

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0467672-001-EG from fdep_erp
  2. 2026-06-12FL_DOR_CADASTRAL
    Captured FDOR_11-26-21-0010-16800-0090_0dbb7c05 from fl_dor_cadastral
  3. 2026-06-13PASCOPA
    Captured PASCOPA_11-26-21-0010-16800-0090_0dbb7c05 from pascopa
  4. 2026-06-14PASCOPA
    Captured PASCOPA_11-26-21-0010-16800-0230_0dbb7c05 from pascopa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Central State Aggregates LLC · Zephyrhill
One-way
7.4 mi
Round trip
14.7 mi
TypeNameCityOne-wayRT mi
quarryCentral State Aggregates LLCZephyrhill7.4 mi14.7
quarryWest Florida AggregateWebster19.1 mi38.1
quarryGeorgia Stone Spring Hill QuarryAtlanta 21.6 mi43.3
quarryTampa Cement Grinding PlantTampa26.1 mi52.1
sand pitCounty Line MineSpring Hill27.4 mi54.9
quarryMid-Coast Aggregates LLC-Mazak MineWebster27.4 mi54.8
sand pit474 Sand MineBrooksville27.5 mi55.1
quarryBrooksville South Cement PlantBrooksville28.7 mi57.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
CITY OF ZEPHYRHILLS

Permits & Sources

Every connector that's seen this project

EARLY SIGNALEnvironmental Resource Permit(FDEP ERP (Water - ERP Noticed General Permit))

Pre-construction environmental clearance for site work. Issued = project cleared to grade; contractor typically not yet selected.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0467672-001-EG2026-05-24Open ↗
fl_dor_cadastralFDOR_11-26-21-0010-16800-0090_0dbb7c052026-06-12Open ↗
pascopaPASCOPA_11-26-21-0010-16800-0090_0dbb7c052026-06-13Open ↗
pascopaPASCOPA_11-26-21-0010-16800-0230_0dbb7c052026-06-14Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
11-26-21-0010-16800-0090
Strap
11-26-21-0010-16800-0090
Address
Acreage
0.36 ac
Sq ft
15,682
Owner of record
CITY OF ZEPHYRHILLS
Last sale

No sale on record

Appraiser valuation
Just (market)
$86,386

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/0dbb7c05