Leads/0d6000a7
Approved · unknownST JOHNS County

Mitigation bank — Town Branch (431 ac)

Town Branch, ST JOHNS County, FL

Load estimate pending
Lifecycle
Permitted as of Sep 12, 2014
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Mitigation bank — Town Branch (431 ac)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 9/12/2014 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Mitigation bank — 431 ac of wetland restoration. Multi-year project with fill / grading / water control structures. Contact: Jason Milton. | stage=permit_issued, but stale (11y old) | single-trade residential permit — capped low | government/public-authority project (floor 55) | stage=permit_issued, but stale (11y old) | single-trade residential permit — capped low | government/public-authority project (floor 55) | stage=permit_issued, but stale (11y old) | single-trade residential permit — capped low | government/public-authority project (floor 55) | stage=permit_issued, but stale (11y old) | single-trade residential permit — capped low | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_MITIGATION_BANKS
    Captured FDEP_MITBANK_4-109-128671-1 from fdep_mitigation_banks

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (landfill)
TILLMAN RIDGE WASTE MANAGEMENT FACILITY · Elkton
One-way
6.0 mi
Round trip
12.1 mi
Closest import source (quarry)
SRM Materials East Palatka · Murfresboro
One-way
15.3 mi
Round trip
30.7 mi
TypeNameCityOne-wayRT mi
quarrySRM Materials East PalatkaMurfresboro15.3 mi30.7
sand pitGrandin Sand PlantJacksonville29.3 mi58.6
sand pitGoldhead Sand PlantJacksonville30.0 mi60
sand pitKeuka Sand PlantJacksonville32.8 mi65.6
quarryDames Point TerminalBrooksville34.0 mi68
quarryEdgar Minerals, Inc.Davenport34.9 mi69.9
quarryThe Chemours Company FC LLCStarke35.6 mi71.2
landfillTILLMAN RIDGE WASTE MANAGEMENT FACILITYElkton6.0 mi12.1
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_mitigation_banksFDEP_MITBANK_4-109-128671-12026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
ST JOHNS
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/0d6000a7