Leads/0c785165
Approved · unknown

Dune Beach Structure — Walkways, Boardwalks And/Or St (Florida First Service Corporation : Long)

4401 Gulf of Mex. Dr., Longboat Key

Load estimate pending
Lifecycle
Filed as of Apr 30, 1981
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

Dune Beach Structure — Walkways, Boardwalks And/Or St (Florida First Service Corporation : Long)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 4/30/1981 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDEP coastal permit (dune_beach_structure) — Walkways, Boardwalks And/Or St. Coastal armor / sand / fill projects typically move 10K-1M+ cy.

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_COASTAL_ENV
    Captured FDEP_COASTAL_ENV_-DBS800011M1 from fdep_coastal_env

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (landfill)
63RD AVENUE EAST WASTE PROCESSING FACILITY · Bradenton
One-way
6.8 mi
Round trip
13.6 mi
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
24.7 mi
Round trip
49.4 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin24.7 mi49.4
quarryWingate Creek MineLithia32.8 mi65.5
quarryFlorida Shell & Fill Company LLCNaples36.1 mi72.1
quarryTampa Cement Grinding PlantTampa39.4 mi78.7
quarrySouth Pasture MineLithia46.1 mi92.2
quarryFour CornersLithia48.5 mi97
landfill63RD AVENUE EAST WASTE PROCESSING FACILITYBradenton6.8 mi13.6
landfillRECOMMUNITY HOLDINGS LP (FKA RRS/FCR)Sarasota7.2 mi14.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_coastal_envFDEP_COASTAL_ENV_-DBS800011M12026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/0c785165