Approved · unknownHillsborough County
FDOT — I-75/SR 93A SB FROM S OF TAMPA BYPASS CANAL TO S OF FOWLER A VE - ADD LANES & RECONSTRUCT
Hillsborough County — FDOT Contract T7501
Load estimate pending
Lifecycle
Active as of Dec 9, 2024
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
FDOT — I-75/SR 93A SB FROM S OF TAMPA BYPASS CANAL TO S OF FOWLER A VE - ADD LANES & RECONSTRUCT
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$46.5M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT earthwork contract — I-75/SR 93A SB FROM S OF TAMPA BYPASS CANAL TO S OF FOWLER A VE - ADD LANES & RE. Vendor: WEBBER, LLC. Cost: $46,465,875. | FDOT public project (+15) | size signal: $46,465,875 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $46,465,875 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $46,465,875 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $46,465,875 valuation (+20) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_T7501_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
9.0 mi
Round trip
18.1 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 9.0 mi | 18.1 |
| quarry | Central State Aggregates LLC | Zephyrhill | 12.0 mi | 23.9 |
| quarry | Caloosa Materials | Ruskin | 23.8 mi | 47.5 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 25.6 mi | 51.1 |
| quarry | Four Corners | Lithia | 29.9 mi | 59.7 |
| sand pit | County Line Mine | Spring Hill | 30.4 mi | 60.8 |
| quarry | West Florida Aggregate | Webster | 34.9 mi | 69.9 |
| quarry | South Pasture Mine | Lithia | 36.5 mi | 73 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
Official source-of-truth portal
Hillsborough County Permits ↗Tampa area permits, inspections, reviews
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_T7501_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Hillsborough
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/0c16ea7f