Approved · unknownBroward County
FDOT — SR-7/US-441 FROM SW 21ST STREET TO NW 3RD STREET - RESURFACI NG
Broward County — FDOT Contract T4682
Load estimate pending
Lifecycle
Completed as of Feb 26, 2025
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
FDOT — SR-7/US-441 FROM SW 21ST STREET TO NW 3RD STREET - RESURFACI NG
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$47K
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — SR-7/US-441 FROM SW 21ST STREET TO NW 3RD STREET - RESURFACI NG. Vendor: OHLA USA INC. Cost: $46,793. | FDOT public project (+15) | FDOT public project (+15) | FDOT public project (+15)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_T4682_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
WHITE ROCK QUARRIES · West Palm Beach
One-way
16.7 mi
Round trip
33.5 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | WHITE ROCK QUARRIES | West Palm Beach | 16.7 mi | 33.5 |
| quarry | FEC QUARRY | MIAMI | 18.5 mi | 37 |
| quarry | PENNSUCO CEMENT PLANT | Medley | 18.8 mi | 37.6 |
| quarry | PENNSUCO QUARRY | Medley | 18.8 mi | 37.6 |
| quarry | Miami Quarry | Jacksonville | 24.1 mi | 48.2 |
| quarry | Epic Stoneworks, Inc. | Cutler Bay | 24.4 mi | 48.8 |
| quarry | Miami Cement Plant | Miami | 25.9 mi | 51.7 |
| quarry | Krome Quarry | MIAMI | 33.9 mi | 67.8 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_T4682_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Broward
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/0bcb237c