Leads/07bd3c21
Approved · planningSarasota County

TEMPLE BETH SHOLOM CEMETERY

801 CIRCUS BLVD, SARASOTA, FL, SARASOTA, FL, 34232

Load estimate pending
Lifecycle
Permitted as of Dec 19, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

TEMPLE BETH SHOLOM CEMETERY

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 12/19/2025 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
$971K
Actual — from source record
Acreage
Parcel 2032050011
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
DEVYN BROWN
Why this is a hauling opportunity: Base unknown/other (20) | size signal: $970,500 valuation (+5) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0467451-001-EG from fdep_erp
  2. 2026-06-13FL_DOR_CADASTRAL
    Captured FDOR_2032050011_07bd3c21 from fl_dor_cadastral

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
25.0 mi
Round trip
50 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin25.0 mi50
quarryWingate Creek MineLithia25.1 mi50.3
quarryFlorida Shell & Fill Company LLCNaples29.0 mi58.1
quarrySouth Pasture MineLithia39.4 mi78.9
quarry4M-31 MineAlva40.0 mi79.9
quarryTampa Cement Grinding PlantTampa41.0 mi82
sand pitWashington Loop MinePunta Gorda42.4 mi84.8
quarryFour CornersLithia43.2 mi86.4
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Permits & Sources

Every connector that's seen this project

EARLY SIGNALEnvironmental Resource Permit(FDEP ERP (Water - ERP Noticed General Permit))

Pre-construction environmental clearance for site work. Issued = project cleared to grade; contractor typically not yet selected.

Official source-of-truth portal
Sarasota County Permits
Sarasota / Venice building permit search
ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0467451-001-EG2026-05-24Open ↗
fl_dor_cadastralFDOR_2032050011_07bd3c212026-06-13Open ↗

Parcel Detail

Property records and ownership

Property
Parcel ID
2032050011
County
Sarasota
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/07bd3c21