Leads/06ffe3bb
Approved · unknownHillsborough County

FDOT — US41 (SR45) FROM MP 0.00 TO 19.50 - RESURFACING

Hillsborough County — FDOT Contract E7R78

Load estimate pending
Lifecycle
Completed as of Nov 5, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

FDOT — US41 (SR45) FROM MP 0.00 TO 19.50 - RESURFACING

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$932K
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT roadway contract — US41 (SR45) FROM MP 0.00 TO 19.50 - RESURFACING. Vendor: AJAX PAVING INDUSTRIES OF FLORIDA LLC. Cost: $932,163. | FDOT public project (+15) | size signal: (+5) | FDOT public project (+15) | size signal: (+5) | FDOT public project (+15) | size signal: $932,163 valuation (+5) | FDOT public project (+15) | size signal: $932,163 valuation (+5)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_E7R78_1 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
2.2 mi
Round trip
4.4 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin2.2 mi4.4
quarryTampa Cement Grinding PlantTampa13.9 mi27.9
quarryWingate Creek MineLithia24.9 mi49.9
quarryFour CornersLithia28.3 mi56.6
quarrySouth Pasture MineLithia30.3 mi60.5
quarryCentral State Aggregates LLCZephyrhill33.5 mi67
quarrySouth Fort Meade MineLithia41.8 mi83.7
quarryGeorgia Stone Spring Hill QuarryAtlanta 45.2 mi90.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_E7R78_12026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Hillsborough
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/06ffe3bb