Mitigation bank — Missing Link Phase II (174 ac)
Missing Link Phase II, Polk County, FL
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 12/11/2023 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Not yet identified
Not yet identified
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_MITIGATION_BANKSCaptured FDEP_MITBANK_430-44171.022 from fdep_mitigation_banks
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | Gator Sand Mine | Brooksville | 1.5 mi | 2.9 |
| sand pit | Green Bay Mine | Davenport | 3.1 mi | 6.1 |
| sand pit | Cypress Sand | Lexington | 3.4 mi | 6.8 |
| sand pit | Hilochee Sand Mine | Davenport | 7.1 mi | 14.2 |
| sand pit | 474 Sand Mine | Brooksville | 8.2 mi | 16.5 |
| quarry | FLINT PLANT | Davenport | 8.5 mi | 17 |
| sand pit | SILICA PLANT | Davenport | 8.6 mi | 17.3 |
| sand pit | Davenport Sand Mine | Brooksville | 8.6 mi | 17.3 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_mitigation_banks | FDEP_MITBANK_430-44171.022 | 2026-05-28 |
Parcel Detail
Property records and ownership
- County
- Polk
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/00b058ee